Exceptional projects of 2017

In 2017 Panevėžio keliai AB finished renewing national road No. 125 Biržai–Raubonys section 0.000-6.980 km, including the cyclist and pedestrian pathway at 2.140-6.900 km. The project also included the construction of the first roundabout intersection in Biržai town. Reconstruction works began in March 2016. Alongside this project the company also completed the reconstruction of national road No. 125 Biržai–Raubonys section 6.980-10.000 km, which included both technical-work project preparation and construction works. The second renewed section begins just beyond Pabiržė village and finishes Kirdoniai village boundary on the far end. The client is the Lithuanian Road Administration (LRA) under the Ministry of Transport and Communications.

***

Reconstruction of main road of national significance A10 Panevėžys–Pasvalys–Riga section 65.190-66.091 km was completed in 2017. The same contract also covered the reconstruction of a three-way intersection on A17 Panevėžys bypass into a turbo-roundabout. The non-standard intersection was built where the bypass meets Panevėžys–Pasvalys–Riga road. Both projects were handled by the contractor from the pre-design proposals and final design, to the construction and project supervision. For the first time in the road sector, the entirety of this project was created in BIM environment. Project implementation began in March 2016. The client is the LRA.

***

In 2017 the company started working on the project “Development of Trans-European Network Road E67 (Via Baltica). Development of Road Section from Lithuanian-Latvian Border to Panevėžys. Contract No. 1”. Project encompasses the first stage of A17 Panevėžys bypass reconstruction in the section 0.000-10.530, which begins at the two-level intersection at Šilagalys village, where main road A2 Vilnius-Panevėžys meets main road A8 Panevėžys–Aristava–Sitkūnai (Via Baltica), and ends at Nausodė intersection, where A17 Panevėžys bypass crosses the main road A9 Panevėžys–Šiauliai.

The bypass will be widened from two to three lanes, creating a 2+1 road layout scheme, when the traffic in the additional middle lane changes direction every few kilometres. That way the faster moving vehicles can safely overtake the slower ones, which is extremely important on the Via Baltica route, known for its growing number of heavy transiting vehicles and high collision rates.  Metal railings will separate opposing traffic in the new 2+1 road layout, along with other safety features.


The first stage of the project began in March 2017 and should be completed in the summer of 2018. The client is the LRA

***

 

Panevėžio keliai AB completed the project “Reconstruction of Trans-European Network Road E85 (Vilnius-Kaunas-Klaipėda). Reconstruction of Grigiškės Transport Junction. Stage 3”.  The third stage encompasses the nationally significant main road A1 Vilnius–Kaunas–Klaipėda section 16.260-17.940 km. The company finished building the first connecting road on the left-hand side of the highway, measuring 1.136 km in length, reconstructed the intersection with regional road No. 4707 Grigiškės–Lentvaris–Dobrovolė. A newly built two-lane bridge over Vokė River along Lentvario Street will also significantly improve traffic movement quality. The bridge connects to Lentvario Street via a newly built street section, while the old bridge was left in place for pedestrian use. The reconstruction project also involves the renewal of two underground pedestrian crossings, relocation and renewal of electricity and communication network, installation of new lighting and drainage networks. Works began in November 2016.  The client is the LRA.

***

 

In the spring of 2017 Panevėžio keliai AB began building a pedestrian viaduct over the Rail Baltica railway in Šeštokai village, located in Lazdijai district. Modern pedestrian viaduct will let the inhabitants safely cross the railway, which in this section is 8 tracks wide. The viaduct overlay is 46.66 metres long and 2.90 metres wide. The width allocated for pedestrians will reach 2.50 metres. The viaduct relies on cable-stayed construction, in which the steel cables are supplemented by virtual supports that lower the bending forces impacting the overlay.  Cables are installed on a pylon which is 26.90 metres high. It is made of two towers connected by reinforced concrete cross-beams.

One of the most important viaduct features is the vertical elevators installed on both ends of the viaduct, which will ease access for disabled pedestrians. The elevators will bring the pedestrians all the way up to the overlay, which sits 9.2 metres above the railway. Elevators of this type are more complicated and expensive than traditional ramps, but the former option takes up less space. It was impossible to build traditional ramps in the densely built Šeštokai railway station approaches. The estimated project end is August 2018. The client is Lazdijai District Municipality’s administration.

***

 

Reconstruction of national road No. 119 Molėtai–Anykščiai section 35.900-41.300 km was completed in 2017. The project involved the reconstruction of a 5.4 km long stretch of one of the most beautiful roads, known to the locals as ‘Biržinka“. The renewed section runs through Anykščiai Regional Park, so it was important to alter the landscape as little as possible and to limit the environmental impact of the roadworks. The section begins at the boundary of the park, goes through its territory and ends at Liudiškių Street in Anykščiai town. Project implementation began in November 2016 and was scheduled to end in May 2018, however the company’s use of newest digital tools and automated machinery control systems allowed to significantly shorten the labour time – the project was finished in autumn of 2017. The client is the LRA.

***

The company carried out the technical-work project preparation, construction and project implementation supervision works for the reconstruction of regional road No. 1245 Gražumynas–Puntukas Stone section 0.000-2.040 km. Project began in December 2016. The client is the LRA.

***

Šilagalys viaduct overhaul began at 7.508 km point of main road A8 Panevėžys–Aristava–Sitkūnai. Work started in May 2017 and should be completed by June 2018. The client is the LRA.

 

***

In 2017 Panevėžio keliai AB continued the overhaul of gravel road sections carried over from 2016, as well as starting new ones, in the regions of  Molėtai, Švenčionys, Ukmergė, Utena, Ignalina, Zarasai, Anykščiai, Panevėžys, Rokiškis, Pasvalys, Biržai and Kupiškis. The client is the LRA.

***

Panevėžio keliai AB completed the second stage of national and regional road reconstruction under contract No. 3 (Kėdainiai–Šėta–Ukmergė). Works began in June 2016. The client is the LRA.

***

Reconstruction of regional road of national significance No. 2804 Giedraičiai–Bekupė–Želva section 9.300-14.040 km was completed in 2017. The project began in August 2016. The client is the LRA.

***

The company carried out the reconstruction of regional road of national significance No. 1303 Biržai–Pasvaliečiai–Saločiai section 13.410-20.360 km. Project started in November 2016. The client is the LRA.

***

Reconstruction works commenced on regional road of national significance No. 2901 Rozalimas–Derveliai–Aukštelkai section 0.240-6.860 km. The project began in November 2016 and should be completed by June 2018. The client is the LRA.

***

Šaltupio Street reconstruction works between Kęstučio Street and town boundary in Anykščiai was completed 2017. The client is Anykščiai District Municipality’s administration.

***

Road surface replacement works were carried out in Latvia, on road A13 Russian border-Rezekne-Daugavpils-Lithuanian border section 144.70-156.60 km. The client is Binders SIA.

***

The company began working on the project “Reconstruction of National and Regional Roads of National Significance. Stage 3. Contract No. 1” in September 2017. The client is the LRA.

***

Design and reconstruction of Stetiškių Street (between Aitvarų Street and Stetiškių Str. 42) in Panevėžys finished in 2017. The client is Panevėžys City Municipality’s administration.

***

Reconstruction works commenced on Biržai Street in Pasvalys town. Estimated end-of-works is April 2019. The client is Pasvalys District Municipality’s administration.

***

Reconstruction of K. Donelaičio Street in Zarasai town is underway. Estimated project completion date is September 2018. The client is Zarasai District Municipality’s administration.